Installation Steps
Step 1: Turn off the gas supply and power before starting installation.
Step 2: Remove the old pilot assembly from the water heater carefully.
Step 3: Install the new pilot assembly with tube, aligning it to the burner properly.
Step 4: Connect the gas line securely and check for leaks using a soap solution.
Step 5: Reconnect power and ignite the pilot following manufacturer instructions.
Step 6: Monitor for proper operation before closing access panels.
Loyalty Program



