Facebook Pixel

Burnham Boiler 106125-01 Natural Gas Pilot Assembly

Special Price $113.42 Regular Price $130.43
In stock
SKU
106125-01
The Burnham Boiler 106125-01 Natural Gas Pilot Assembly is an essential component that guarantees efficient and reliable ignition of natural gas for heating systems. This assembly is the 24-volt AC and includes the thermocouple, pilot tubing, pilot burner and other essentialparts. In Burnham boilers, the pilot assembly’s small flame is used to ignite the primary burner. The thermocouple senses the heat from the burner and produce a small electrical voltage that holds the gas valve open. The thermocouple makes the process safe since it cools off and shuts off the gas supply if the pilot's flame is extinguished.
https://www.partshnc.com/media/catalog/product/1/0/106125-01.jpg

Specifications

  • Weight:0.29lbs
  • Type: Natural Gas
  • voltage: 24V AC
  • Components:Pilot Burner,Thermocouple and Pilot Tubing
Manufacturer Name: Burnham Boiler
Product Number: 106125-01
OEM Part Number: 106125-01
Product Description: Pilot Assembly Natural Gas
Weight:0.29lbs/131.54g

Choose the best HVAC equipment parts and supplies from PartsHnC!

  • Same Day Shipping

  • Best Quality And Best Price

  • Wide Range of Inventory

  • Best Customer Service

Have More Questions or Need Help to Place The Order?
Reach us at (866)773-0907 or [email protected]

Write Your Own Review
You're reviewing:Burnham Boiler 106125-01 Natural Gas Pilot Assembly
Your Rating
Customer Questions
What maintenance is required for the Burnham Boiler 106125-01 Gas Pilot Assembly?

Inspect the pilot flame regularly and keep the orifice clean from dust and carbon buildup. Ensure gas connections are tight and leak-free. ensures proper accurate ignition and safe system operation.

What are common issues with the Burnham Boiler 106125-01 Gas Pilot Assembly?

  • Weak or intermittent pilot flame due to clogged orifice.
  • Difficulty igniting burner from gas flow inconsistency or air in line.
  • Soot buildup causing unstable combustion or flame outage.
  • Gas valve or thermocouple malfunction leading to shutdown.

Installation Steps

Step 1: Turn off gas supply and electrical power; allow boiler to cool and ventilate area.

Step 2: Remove access panel and disconnect existing old pilot assembly and tubing carefully.

Step 3: Install new pilot assembly, secure mounting bracket, and connect gas line using approved sealant.

Step 4: Reconnect thermocouple/ignition leads per diagram and tighten fittings.

Step 5: Restore gas slowly, leak-test all connections, and check pilot ignition operation.

Step 6: Perform final combustion check and ensure stable flame before closing panel.